Pre-contract management
In the construction industry, contract management is the process of managing contracts that are made as part of the delivery of a built asset. It involves the creation, analysis and execution of contracts by the parties to those contracts to ensure operational and financial performance is maximised, and risks are minimised.
Contract management can categorised into three phases:
- Pre-contract phase.
- Contract execution phase.
- Post-award phase.
The pre-contract phase is the preparation stage. This is when ideas start to form about the project and it is described in theoretical terms. It is also when intentions are solidified and relationships begin to take shape.
Although each scenario may be different, these are some of the typical steps that may be included in the pre-contract stage.
- Survey phase. This is when the project team starts to collect survey information for the project. It may include contributions and basic options from all consultants regarding the feasibility of the project. This information can start to form a design brief around ideas provided by the client.
- Outline phase. At this point, the project team creates a concept based on the design brief requirements and provides an outline that includes input from relevant parties and authorities.
- Scheme design. This phase is when the project team shapes the agreed upon idea into a working proposition including approvals from applicable authorities.
- Detail design. During this phase, the project team has fully developed the idea for the project, including specialist design work for structures, electrical, plumbing and HVAC installations and other required services that will be provided by sub-contractors..
- Construction information. At this point, the project team prepares detailed working drawings and specifications that define all aspects of the project.
- Measurement. The project team will prepare the bill of quantities including measurements for materials and estimates of labour costs for the project.
- Tendering. This is when tender documents are prepared, tenders are sought from selected contractors and contract negotiation is undertaken.
Once these phases are complete, there is an analysis of tenders that ideally concludes with the client awarding the project to the successful contractor based on the approved design, strategy and documentation.
[edit] Related articles on Designing Buildings
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.